Construction is well underway as fudraising continues.

   <<Photo PAGE 1  <<Photo PAGE 2
Photo PAGE 3
   Photo PAGE 4>>   Photo PAGE 5>> Photo PAGE 6>>

PAGE 3
FACULTY HOUSING FACILITY

October 3, 2007
looking southeast


Footings are put in place upon which foundation walls are built.
October 3, 2007
looking east


The foundation walls are poured in the Faculty Housing Facility, creating a crawl space.
Top

REHEARSAL FACILITY / STUDENT DORM and SITE PLAN

October 3, 2007
looking west


The concrete floor is poured in the Rehearsal Facility / Student Dorm. Plumbing, electrical, and communications wiring has been installed first.


The Dutton Concert Barn, visible at left and central in the Site Plan above, will remain the primary performance venue at Birch Creek.

Top

MAINTENANCE FACILITY FOUNDATION

October 3, 2007
looking southwest


The new Maintenance Facility (footings are in place here) will replace the existing Maintenance Building, right.

October 5, 2007
looking south


The concrete floor is poured for the Maintenance Facility.
Top

MAINTENANCE FACILITY FLOOR and WALLS


October 9, 2007
looking southeast


Quickly, the Maintenance Facility is framed and walls go up.


October 15, 2007

And the roof goes on the Maintenance Facility, complete with cupola.

Top

MAINTENANCE FACILITY CUPOLA



October 15, 2007

The Maintenance Facility’s cupola is an architectural element repeated elsewhere on Birch Creek’s campus... (see photo, right)

...including the existing Gazebo (inset). The gazebo on the Maintenance Facility is pictured above on November 20, 2007--finished and with windows installed. Now the board and batten siding designed to replicate the original barn, and the six-pane windows are evident.

THE OLD SHOP COMES DOWN

October 20, 2007

The old makes way for the new. After removing the siding and the walls to recycle for use elsewhere on campus, the old shop is pulled down. Visible beyond the roof in the last picture is the new Maintenance Facility with its proud cupola!

Top

   <<Photo PAGE 1  <<Photo PAGE 2
Photo PAGE 3
   Photo PAGE 4>>   Photo PAGE 5>> Photo PAGE 6>>


We are still working hard to meet our goal of $3 million and need your help. We are two-thirds of the way there. Your contribution can help ensure that Birch Creek will remain a major force for music education and cultural enrichment locally, regionally, and nationwide.

EASY WAYS TO CONTRIBUTE
Giving is easy and can be a one-time donation or a gift that is pledged over 3 to 5 years.

Donate Online:

donate now

You can make a donation for Perfect Pitch online with your debit / credit card or by using PayPal.
I'd rather phone in my donation:

Jennelle Berg
jennelle@birchcreek.org
(920) 868-3763
(920) 868-1643 fax
I'd rather mail my donation:

Download a PLEDGE CARD

Top

BIRCH CREEK
• 3821 County E • P.O. Box 230 • Egg Harbor, WI 54209-0230
Phone 920-868-3763 • Fax 920-868-1643 • Email
mainoffice@birchcreek.org
© Birch Creek Music Performance Center, Inc. 2008-2012